Home Opinion Zoom LensBusiness Crime WatchSportsLifestyleArchives Contact Us Feedback
         
     

 

   

 

 

 

ENGINEER VELOSO TWITS CRITICS

MAASIN CITY – We have been informed by District Engineer Carlos Veloso that allegations made by a certain Samuel Palaganas and a concerned Maasinhon claiming that the Tuburan Bridge now under construction would be the same size as the old bridge was totally false.

Engineer Veloso also provided SLT this sketch which shows that the new bridge would be one meter wider (on each side) than the old bridge.

Veloso added that the new structure would also have a "safety sidewalk" on each side measuring 0.80 meters so pedestrians can cross the bridge safely.

He said the Tuburan and Combado bridge should be completed on or before June 30, 2012.(By MARK RIMAS)








 

 

 

   

Other News

Quarrying face-off set

Roxas listens to local media

Abaca harvest down 75 percent

Local firms go bankrupt

Pneumonia is our top killer

Bontoc councilor hit by protests

Sogod mayors need 2m to combat crown of thorns

Maasin City's Anjonay fiesta

Most southern Leyteños prefer civil weddings

Saddle road to be reconstructed

"Tabo sa DepEd" to open this July

Provincial board highlights

Local gas prices probes

We need an agrressive population control program

Miss Southern Leyte candidates 2012

 

 

 

 

|Home| |Opinion| |Zoom Lens|Business|Crime Watch| |Sports|Lifestyle |Archives| |Contact Us| |Feedback|

Copyright 2001-2011 SOUTHERNLEYTE TIMES.com, A SOUTHERN LEYTE TIMES Company